Hits:
Journal:Shanghai Urban Planning Review
Key Words:City infrastructure planning and construction, Sustainable development, Environmental bearing capacity, Ecological engineering technical method
Abstract:Anlysis on the disadvantages of the traditional city infrastructure works planning method. It is based on the sustainable development view carrying the environmental bearing capacity analysis, the scientific formulation of the resource consumption index into the formulation process of the city infrastructure planning, and on the consideration of application for ecological engineering technical method, thus forming the thought on sustainable development regarding the city infrastructure planning and construction.
Indexed by:Journal paper
Discipline:Engineering
First-Level Discipline:Urban and Rural Planning
Document Type:J
Issue:5
ISSN No.:1673-8985
Translation or Not:no
CN No.:31—1706/TU
Co-author:周珂